• inner-page-banner

FAQs

Filter

For a particular city if the survey proposal was prepared for the part of the city then it is called as Partial. If the survey proposal is prepared for the complete city then it is called Whole City.

NMMU means National Mission Management Unit,
SMMU means State Mission Management Unit and
ULB means Urban Local body.

If all the required documents are completed in loan application details, then only you can make entry in Screening of Application.

The maximum size of DPR should be less than or equal to 1MB and the acceptable format is in PDF only.

Those who entered the trade, only that user credential can modify the trade/data. If NMMU created any trade then only NMMU can edit or modify that trade.

Training on the topics defined in curriculum is provided to the technical experts.

Yes, Maximum size of the photo should be less than 100 kb. It accepts only the following formats JPG, JPEG. Other Image formats are not allowed.

Ward is a subdivision of local authority area.

NMMU will release money for all components and define targets for all states.

The amount approved by task force should be less than or equal to loan required amount applied by applicant. The Maximum limit for the SEP-I is 2 Lakh and for the SEP- G is 5 Lakh.

Yes, Proposal submission date should be less than or equal to today’s date.

All the three users that are NMMU, SMMU and CMMU are authorized to conduct training programmes. NMMU will conduct national and regional training programmes. SMMU will conduct state level training programmes. ULB conducts city level training programmes.

SHG formed under means whether the SHG is formed through the old SJSRY scheme, NULM Scheme or any other Scheme.

Street Vendor Survey, Plan proposal can be edited before taking any action by SMMU/state authority.

State will fix target for ULB’s.

If the Application is rejected by bank then it will be deactivated from database and this record will not further visible. Banks can reject the applications till the loan is disbursed.

Yes, Expected Date of Completion should be greater than or equal to todays and it should be greater than or equal to the date of submission.

There is no fixed duration for any courses. It varies from course to course.

1. Both From date and To date cannot be a date greater than the current date.
2. Dates must be entered in the format of ‘dd/mm/yyyy’.
3. To date should be greater than From date.

Top